Project summary
Thorpe Lea Manor is a small residential development located on a brownfield site in the historic town of Egham.
The site consists of 52 units of 1 to 4 bedroom houses and apartments.
The design of the site is entirely gas-free with Electric Vehicle chargepoints to be installed at each property, and also implements an urban wildlife strategy.
Works undertaken to date include:
- mains sewers and access road.
- foundations and substructure brickwork.
Scope of works
- Principal contractor for initial works
- Infrastructure and Section 278 works
- Substructures and foundations
- Drainage
- Services and external works
- Sewers including surface water attenuation tanks
- Client
-
- Start Date
- 2024
- Duration
- 2 years